On last Thursday the pupils of the class 7 of the German International School Doha got admission to visite two of the metro building sites Green Line Doha. Contruction Director Adi Hagelüken organized an exciting excursion to the stations named “Messila” and “White Palace”. Before the visit there was a H&S site induction and PPE were handed over to the children.
The trip was organized and financed with the Joint Venture JVPSH, Mr Hagelüken and Werktag.org . Thank you so much!
Special thanks to Qatar Rail/ Doha for approving this visit.
The use of images and texts on this website without approval is prohibited.
The copyright belongs to © V.v.Willendorf, Doha/Qatar, with autorisation Qatar Rail/ Doha
- Ein Diavortrag über den Tunnelbau in Doha
- Adi Hagelüken, Construction Director der Green Line erklärt die Tunnelbohrmaschine (TBM)
- Nach dem Anziehen der Sicherheitskleidung geht es endlich los
- Klasse 7 der Deutschen Internationalen Schule Doha mit Adi Hagelüken (2. h.l.) und Katrin Faske (5. h.l.)
- Die größte U-Bahnbaustelle Dohas: White Palace der Green Line
- Ingenieur Christian Rehbein erläutert den Sicherheitsdurchbruch
- .
- .
- .
This post is also available in: German












